contact 

Interested in something? Not sure? Feel free to drop a message.

Built-to-order artistic sound diffusion panels made from reclaimed wood.  

In Progress

Want to know the progress of your project?  Keep track of it here in blog form.  

Santa Cruz, CA

adriaan mol

Project Title: Unpainted Nebraska x 20

Status: Complete

Ship Date: Most likely 6-12

5-29-20: Thank you for stopping by your project will be underway soon. 

5-31-20: Good news! Your project is In Prep mode. Lots of little pieces glueing up and getting ready for assemblage. Nothing to see yet. However, most likely the eve of June 1 will let another tale. Stay tuned!

6-1-20: And we’re off! Things are starting to take shape. A little here and a little there. Here are a few pics of some underway.

6-3-20: And we have some brewing. Looks like it’s up to 11 at half status. Still chipping away at the stone.

6-8-20: And we have all 20 at half mast. That is to say the tops are gluing up. Then it’s the hanging cleans, cleanup, and pack up. Look like they will go out by the end of the week at the latest. Most likely Wed, Thurs, so you’ll see them next week Mon or Tues. Not too far off estimated turnaround.

6-10-20: Things are looking good for a FedEx drop off on Friday. The 20 panels are pretty much complete. Just do some finishing touches and pack. That will happen tomorrow for a goal of dropping them off at FedEx on Friday. Here is a sneak peak. Additional layout info later in another entry. Thanks for waiting BTW.

6-12-20: And they’re off! You’ll see a tracking email soon. Thank you for supporting a small business during these times. Look for a more detailed update on the step by step layout of the batches. More soon cheers!

6-16-20: Here is a breakdown of the layouts for the '4’ x 4’ and 2’ x 2’ groupings. At least the way they were laid out prior to shipping….Feel free to do whatever you see fit of course.

  • Each panel is marked 1, 2, 3, or 4

  • See attached grid for designed placement below.

  • It doesn’t matter which numbered panel goes where. The 1,2,3,4 guide is to create a diamond shape.

  • In the pics below shows that the panels were mounted in “dead wood” which is a sheet of 3/4” or 1/2” Plywood the size of the 12sq 4’ x 4’ shape and 2’ x 2’ 4sf shape.

  • The idea of the “dead wood” (optional) is just a tip to avoid excessive holes in the brick wall as seen in the studio pics. It requires only 4 anchor points to the wall rather than many more with the cleats. It also provides a square grid.

  • Upon the “dead wood” the hanging cleats were mounted. The panels then hang on the cleats.

  • In these pics 4’ strip cleats were used for the 4’ x 4’. Includes in the kit are 12 6” cleats. However, one can draw a line and center them within the grid. They drop nicely at 4 1/8” above the bottom lines of each 12” x 12” row.

  • Once the cleats are on strat with mounting them on the bottom.

  • A good tip is to not mount the top row of cleats until one has hung the lower rows. As the nature of the beast is: things tend to grow a bit. So by adding the top row last one can achieve a snug fir to the top row.

  • That’s about it. If there are any questions feel free to ask.

Tucson, AZ

adriaan mol

Project Title: Unpainted Nebraska x2

Status: Complete

Ship Date: 6-3-20

5-29-20: Thank you for stopping by your project will be underway soon. 

5-31-20: Good news! Your project is In Prep mode. Lots of little pieces glueing up and getting ready for assemblage. Nothing to see yet. However, most likely the eve of June 1 will let another tale. Stay tuned!

6-1-20: Thank you for waiting. Things are taking shape. Just have to let them dry and then finish up. Looks like they will ship on Wed.



6-2-20: Guess what? They are done! These two fellas are packed up and ready to ship out tomorrow. Look for another email for the tracking info. Thank you very much for supporting a small business during these times. Good luck with the Audiophile Suit and send in pics if/when you can….Cheers!



Lexington, KY

adriaan mol

Project Title: Unpainted Montreal and Dells

Status: Complete

Ship Date: 5-8

5-5-20: Thank you for stopping by the eBay listings your project will be underway soon. 

5-7-20: And they’re off! Look for then with a Postal Delivery carrier near you. Thank you for supporting small business during these times. Cheers!

Bastrop, TX

adriaan mol

Project Title: Unpainted Chicago

Status: Complete

Ship Date: 4-9

4-5-20: Thank you for stopping by the Reverb site, Also, a HUGE thank you for supporting a small business during this time. Your project will be underway soon.

4-6-20: And we’re off to the races. Just have to let some glue dry and finish it up. Looks like they will ship soon.

4-8-20: Thank you for standing by. Your project will ship tomorrow. Thanks again and happy Studio-ing. Stay safe.



Austin, TX

adriaan mol

Project Title: Unpainted Nebraska (x2)

Status: complete

Ship Date: 4-8-20

4-6-20: Thank you for standing by. The project is mooooving along smoothly. Just have to let some glue dry and do the finishing touches. Looks like they will ship around Wed or Thurs.

4-8-20: And thank you for shopping at your local Diffuser City. Your project will ship tomorrow. Buckle up and wash up. It’s a crazy world out there. Cheers and stay safe.

Runnemede, NJ

adriaan mol

Project Title: Unpainted Nebraska x 2 - and + 1

Status: Complete

Ship Date: most likely 5-8-20

4-1-20: Thank you for poking around the eBay listings and heading straight on over to Diffuser City. Then again, let’s make that a HUGE THANK YOU for also supporting a small business during this crazy time. Your project will be underway soon.

4-2-20: Things are running smoothly. Let’s just let the glue dry and then they should go out tomorrow eve.

4-8-20: By the time you read this you’ll already have them on the stoop. Hope they arrive OK. Thank again for the business. Stay safe

5-5-20: Thanks for stopping back. Your project is underway and will ship soon. Cheers!

5-7-20: and it’s off! Thanks again for stopping back by. Send pics when you can. Stay safe.

Denver, CO

adriaan mol

Project Title: Unpainted Chicago

Status: Complete

Ship Date: 3-25-20

3-22-20: Thank you for stopping by the Reverb shop. Also, a HUGE thank you for supporting Small Business during hard times. Your project will be underway shorty….

3-23-20: And away we go…just letting the glue dry and then finish them up. Looks like they will ship on Wed.

3-25-20: Thanks again! Your project is on the way!

Daly City, CA

adriaan mol

Project Title: Unpainted Wisconsin 3 pack

Status: Complete

Ship Date: 2-29-20

2-25-20: Thank you for stopping by the eBay listings. Your project will be underway soon. Stand by for updates.

2-26-20: Here is a look at what is going on. We are through the initial stages and off to the races. Let’s let these guys glue up for a minute.

2-29-20: Thank you for waiting. Your project will ship out today. Enjoy!

Glendal, CA

adriaan mol

Project Title: Unpainted Nebraska

Status: Shipped

Ship Date: 1-23

1-10-20: Thank you for stopping by the Reverb page your project will be underway soon.

Hopewell, NJ

adriaan mol

Project Title: Unpainted Nebraska 4 Pack

Status: Complete

Ship Date: 1-14-20 or sooner

1-9-20: Thank you for stopping by the Reverb page. Your project is underway. It has some good progress and is glueing up.

1-13-20: Good news! Your project is ready to ship. Look for it soon with a UPS driver near you. Please leave feedback when you can, cheers!

Apple Valley, MN

adriaan mol

Project Title: Unpainted Nebraska

Qty: 16

Status: Complete

Ship Date: 1-15-20

1-4-20: Happy New Year (can still somewhat say that) and thank you for stopping in. Your project will got into prep mode now. Not much to see for a while but keep checking pics with pop up soon.

1-7-20: Things are starting to take shape. Plenty of colors to go around so far. Here is a sneak peek at four in progress.

1-8-20: And the beat goes on.. 8 more are glueing up.

1-9-20: And the goes on again. Another four are glueing up. Looks like they will ship Monday or Tues at the latest.


1-13-20: Pure focus on the completion and packing of your project at hand. Stand by for tracking and completed pics in the next 24 hours.

1-14-20: Thank you for waiting your project is now complete. See the tracking in an email. Here are some pics of the in groups of four. Thanks again.

Holladay, UT

adriaan mol

Project Title: Unpainted Nebraska 4 Pack

Status: Complete

Ship Date: 1-6-20

1-2-20: Thank you for stopping by the Reverb pages. Your project will be underway soon.

1-4-20: Things are taking shape. Looks like you’ll ship really really soon.

1-5-20: Thanks again for stopping by the Reverb Shop. Your project is complete and will ship out tomorrow.

Capitola, CA

adriaan mol

Project Title: Unpainted Nebraska with a 9 sf total

Staus: Complete

Ship Date: 12-12-19

12-4-19: Thank you for stopping by the Reverb page. Your project will be underway soon. In the meantime, let’s nail down the 9 square foot layout plan and get the ball rolling on the design. More soon…

12-9-19: Things have taken shape. Now let’s let the glue dry a bit. Then the backs….

12-10-19: Still tweaking…but moving ahead. Looks like the plan for shipping by the end of the week is still on. Just have some minor tweaking to do….

12-11-19: And the beat goes on. Your project has been completed. Thank you for waiting and it will set sail tomorrow via UPS. Please see the tracking info in the Reverb transaction.

Bay City, TX

adriaan mol

Project Title: Unpainted Chicago

Status: Complete

Ship Date: 12-6

12-2-19: Thank you for stopping by the Reverb page. Your project will go into prep this evening and will be built in the next few days. You’ll see a tracking number in the Reverb listing soon since there is a time limit. It will show as unshipped for a few days until it actually is dropped off. More later…..

12-3-19: Things are moving along smoothly and taking shape. Let’s let the glue dry and finish up. Then it will be ship time. Looking at a Friday off.

12-6-19: They have shipped. Thank you for standing by. Cheers!

Winchester, MA

adriaan mol

Project Title: Unpainted Nebraska

Qty: 16 square feet, 12 more

Status: Complete

Ship Date: 1-7-20

11-15-19: Thanks for stopping by the Reverb page. Let’s get things in order and figure something out.

11-19-19: Things are past the prep stage and the glue is drying for what that entails. Nothing to see yet but things are moving along. Looks like tomorrow there will something taking shape.

BTW: You’ll see a tracking number in the Reverb transaction. For now, that is a placeholder since there is a time limit. When it actually ships you’ll receive a notification. More later…

11-20-19: Things are starting to take shape. Not much to see yet but there is PLENTY of sawdust here to prove it. Next, go around will be much more.

11-21-19: Here we go, Here are 8 tops shaping up. More this weekend and into Monday.

11-25-19: Things are looking clear for takeoff on Wed, Although, I am debating if it might be better to drop them off after Thanksgiving rather than have them sit on a truck for a few days while Fed Ex is closed. Hmm, will look into that…

Here are another 8 tops with glue drying. Next up is the cleats, last looks, and packing.

11-26-19: It’s going to take another day after all. Looks like Fed Ex is open the day after Thanksgiving. Drop off will on Friday (and it helps) due to the holiday scramble. All 16 are sanded and looking nice. Many cleats and such are waiting in the wings. Stay tuned for a group shot and a layout plan prior to shipping. Enjoy the Holiday…Cheers!

11-30-19: Thanks for waiting. Hope the Holiday weekend when well. Your project has shipped. Here is a pic as well as the suggested layout. See the numbers on the back of the panels for reference. Send in pics when you can cheers and thank you!


12-26-19: Thanks for stopping back. Your project will go into prep mode no. It’s slow mode around here due to the Holidays. However, when a chance is given something gets done. Hang tight for more info soon.

1-4-20: Happy New Years (can still say that right?) things are taking shape on the next round. Looks like they will ship either 1-6 or 1-7. Stay tuned…

1-5-20: We’re clear for take-off. The next leg of the project has been completed. They will ship out on Tues (just have to pack them up). Thanks again!

NOTE: The numbers on the back are 4 pack layouts. You can hang them any way you’d like. Really liking what you’ve chosen already….awesome!

Houston, TX

adriaan mol

Project Title: Painted Easter Island guitar hanger

Status: Complete

Ship Date: 11-19

11-11-19: Thank you for the purchase of the guitar hanger. Your project will be underway shortly. It should take a few days and should ship by the end of the week. Stay tuned for progress pics.

11-12-19: and the beat goes on! Things are taking shape. Just have to let the glue dry then it’s time for paint.

11-13-19: “Paint It Black” is a great song…and so is this choice for the finish. The first coat has been applied. The rest if downhill from here depending on the weather. That said, let’s see how things pan out for the end of the week drop off at Fed Ex. It might be better to shoot for Monday to be safe. It will be about the same date of delivery either way. We’ll see.

11-16-19: And the beat goes on.. Just finishing up the paint and adding the hanging system. Then it’s ready to ship.

11-18-19: Thank you for waiting. It is complete and set to ship tomorrow. These pics do not do it justice. Please see the tracking in an email. Thanks again and have good time. Send in pics if you can.

Somewhere, USA (undisclosed location)

adriaan mol

Project Title: Unpainted Nebraska - QTY 32 + addition

Status: Complete

Ship Date: 11-4/5-19 & 12-20-19

10-5-19: Thank you for stopping by. It will be a pleasure to be part of the ISO booth. Your project will be underway soon. Check back for updates as they are uploaded.

10-14-19: Prep stage is done (takes the longest). Some are starting to take shape. More will take shape tomorrow too. Stay tuned for more.

10-17-19: And the beat goes on with more in the making.

1-17-19: Moving along strong. It’s up to 18 partially done (80% stage). Next week pretty much get all 32 to the 80% stage. Then it’s just finish work like the hanging cleats and packing. Safely said, things are looking good to be on target for the one month turnaround.

10-21-19: Still going strong! It’s up to 28 square feet at 80%. Still on schedule and running smoothly..

10-24-19: And away we go! We now have 32 square feet at 80%. Just have to finish things up, add backs, add cleats, and pack. Then they are off!

10-29-19: Not much to see as a whole yet. Just a bunch of cleats and feet. WOW! Thats a lot of feet, It will all come together in the next few days, right on schedule.

10-30-19: Looks like we have 16 at 100%. Will try for a full layout pic tomorrow (scratch that) or at least in the next few days. There isn’t enough space on the dilapidated test wall.

10-31-19: However, I’m putting together a 4 x 8 sheet of plywood for a test installation piece. It will tell the story of the actual measurements for the layout with the 4’ cleat stripping. So, stand by for that. It will help you in the long run for the install.



11-3-19: Thank you for waiting your project is now complete! It ill be packed and sent right away if you are ready. In the meantime. here are some pics of the installation process and some notes to help on your end.

INSTALL NOTES:

  • Step 1: Lay the cleats out in the 4’ x 8’ area. Is these pics you can see the black line represents the 1’ marks that layout to the bottoms and tops of each row.

  • Step 2: Lay the cleats out. They drop nicely at 4 1/8” above the bottom line to the bottom of the cleat.

  • Step 3: Lay the panels out in each group (1, 2, 3, and 4). It is much easier to star this way if going by the suggested layout design. It can get pretty confusing otherwise.

  • Step 4: Start loading the cleats with the panels starting at the bottom row.

  • Step 5: Give yourself a high 5 once you’ve loaded the top row because that’s it!

  • Step 6: Send in pics for the website, please.

SUGGESTED LAYOUTS:

Here are a couple pics of a few layout options. Other layouts are possible. Feel free to play around and have fun.

12-10-19: Welcome back! The next portion of the project will be underway next. Just have to do some thinking and planning on the dims. Shouldn’t be too difficult. Stay tuned…

12-16-19: Good news! Things are starting to take shape. The project is about 1/2 way through the layout process. The holiday are in the way for sure, However, doing the best to see it though. Please bare with…more soon.

12-18-19: The tops are done and glueing up. Took a while to match the lines and cross reference the end of the first column to make everything blend. However, it works. Just have to do some finish work, take pics, and do a quick Photoshop mock-up just to make sure everything is on point. Feeling very confident! Stay tuned.. Looks like they will ship by the end of the week.

12-19-19: Good news! The addition will ship tomorrow. See the pics and a (bad) Photoshop layout of them added. After doing so, I’ll send another package in a few days and call upon your teamwork. The package will be some parts from the addition to mix in to the other panels as you see fit. Doing so will blend the new with the older if need be. Shouldn’t be many, just glue them on with either a hot glue gun and wood glue combo or whatever you see fit.

It’s difficult to match prior builds even though I still had a lot of the stock used on hand. As for the shapes and angles, it’s right on. No redundant pieces next to each other, that’s good. That took some time but it worked.

Hanging: use the same grid as before. Just add the cleat to the same cleat line prior. The panels are broken down into four 7.5” x 12” panels. The “grout line” at the 90 is faux. It should all match up with one cleat per panel. See the other (bad) Photoshop drawing for the sequence.

The panels will ship tomorrow. Look for another box with parts after that. Cheers!


















Tulsa, OK

adriaan mol

Project Title: Unpainted Nebraska 4 Pack

Status: Complete

Ship Date: 10-11-19

10-5-19: Thank you for stopping by the Reverb page. Your project will be underway soon. Looks like it will ship toward the end of the week. Check for a tracking number in the Reverb transaction soon.

10-8-19: things are starting to take shape.

10-10-19: Thank you for waiting your project is complete ready to roll!. Stop back anytime!

Arlington, MA

adriaan mol

Project Title: Unpainted Berlin

Status: Complete

Ship Date: 9-30-19

9-24-19: Thank you for stopping by the Ebay listings. Your project will be underway sooooon.

9-29-19: Thank you for waiting. You’re project will ship tomorrow. Cheers!

Westminster, CO

adriaan mol

Project Title: Unpainted Nebraska 4 pack plus 1 more.

Status: Complete

Ship Date: 9-18

9-11-19: Thank you for stopping the Reverb listings. Your project will be underway soon. Stay tuned for updates as the project progresses here.

9-16-19: Things are taking shape. Let’s let the glue dry. Then the cleats and feet. Then it’s time to ship them out.

public.jpeg
public.jpeg

9-18-19: Thank you for waiting. Your project has left the building. Please send in pics.